通風(fēng)管道的安裝比較重要的是細(xì)節(jié)方面的因素,要保證好整體的使用效果,就要在安裝上多下功夫,包括安裝前的前提以及安裝規(guī)定,這兩方面的要求都要注意,接下來(lái)濟(jì)南通風(fēng)管道加工人員為您講解這方面內(nèi)容。
The installation of ventilation pipes is more important for the details. To ensure the overall use effect, more efforts should be made on the installation, including the premise and installation regulations before installation. Attention should be paid to these two requirements. Next, the ventilation pipe processing personnel in Jinan will explain this aspect to you.
安裝的前提條件:
Prerequisites for installation:
1.完成建筑圍護(hù)結(jié)構(gòu)施工,所有障礙物和雜物,地面雜物。
1. Complete the construction of building envelope, remove all obstacles and sundries, and remove the ground sundries.
2.安裝凈化系統(tǒng)風(fēng)道時(shí),建筑物內(nèi)部構(gòu)件的地板已準(zhǔn)備好,墻體混凝土已找平,需要在無(wú)灰塵或室內(nèi)情況下進(jìn)行防塵措施。
2. When installing the air duct of the purification system, the floor of the internal components of the building has been prepared and the concrete of the wall has been leveled. It is necessary to take dust-proof measures when there is no dust or indoors.
3.安裝現(xiàn)場(chǎng)的輔助材料需要齊全,施工技術(shù)人員應(yīng)提供質(zhì)量和技術(shù)指導(dǎo)。
3. Auxiliary materials on the installation site shall be complete, and construction technicians shall provide quality and technical guidance.
濟(jì)南通風(fēng)管道加工
通風(fēng)管道安裝規(guī)定:
Ventilation duct installation regulations:
1.風(fēng)管內(nèi)嚴(yán)禁跨越其他管道;
1. It is forbidden to cross other pipes in the air duct;
2.安裝在易燃易爆環(huán)境中的風(fēng)管應(yīng)良好接地;穿過(guò)生活區(qū)或生產(chǎn)區(qū)的風(fēng)管需要嚴(yán)格安裝,不能安裝風(fēng)管接口。
2. Air ducts installed in flammable and explosive environment shall be well grounded; The air duct passing through the living area or production area shall be strictly installed, and the air duct interface shall not be installed.
3.室外垂直風(fēng)道的固定不得與避雷針或房屋防雷設(shè)施連接。
3. The fixing of outdoor vertical air duct shall not be connected with lightning rod or house lightning protection facilities.
4.風(fēng)管的安裝需要符合以下技術(shù)規(guī)定:
4. The installation of air duct shall meet the following technical requirements:
(1)風(fēng)管與通風(fēng)設(shè)備及附件的連接配置不得減少連接部位的連接管。
(1) The connecting configuration of air duct and ventilation equipment and accessories shall not reduce the connecting pipes at the connecting parts.
(2)吊架不得設(shè)置在風(fēng)口、風(fēng)閥、檢查門和自動(dòng)控制機(jī)構(gòu)處,也不得固定在法蘭上,以免風(fēng)道變形影響風(fēng)道功能。
(2) The hanger shall not be set at the air outlet, air valve, inspection door and automatic control mechanism, nor fixed on the flange, so as to prevent the deformation of the air duct from affecting the function of the air duct.
(3)吊架安裝需要符合相應(yīng)的安裝規(guī)定。懸掛的風(fēng)管和部件應(yīng)設(shè)有防止擺動(dòng)的固定點(diǎn),如固定支架、支撐架等。固定點(diǎn)的位置和數(shù)量應(yīng)根據(jù)系統(tǒng)確定。根據(jù)輸送空氣的溫度,法蘭墊的材料和厚度會(huì)有所不同。風(fēng)管及其部件穿過(guò)墻壁和屋頂時(shí),應(yīng)設(shè)置雨罩。當(dāng)穿過(guò)屋頂?shù)娘L(fēng)道超過(guò)1.5m時(shí),應(yīng)為拉索。拉索應(yīng)為鍍鋅或鋼絲繩。
(3) The installation of hangers shall comply with relevant installation regulations. The suspended air ducts and components shall be provided with fixed points to prevent swinging, such as fixed supports and support frames. The location and number of fixing points shall be determined according to the system. The material and thickness of the flange gasket will vary according to the temperature of the conveying air. When air ducts and their components pass through walls and roofs, rain covers shall be provided. When the air duct passing through the roof exceeds 1.5m, it shall be cable. The cable shall be galvanized or steel wire rope.
以上就是通風(fēng)管道的施工的前提及其裝置時(shí)的要求的介紹,在進(jìn)行安裝時(shí)要保證風(fēng)管的安裝需要符合相關(guān)的技術(shù)要求。在后期的使用中也要保證良好的效果,安裝時(shí)也不得損壞保溫層。關(guān)注我們http://www.chapte.com,了解更多事項(xiàng)!
The above is the introduction of the premise of the construction of the ventilation duct and the requirements of the device. During the installation, it is necessary to ensure that the installation of the air duct meets the relevant technical requirements. Good effect shall be ensured in later use, and the insulation layer shall not be damaged during installation. Follow us http://www.chapte.com Yes, learn more!

上一篇:通風(fēng)管道加工出現(xiàn)這兩方面問(wèn)題可這樣解決
下一篇:通風(fēng)管道質(zhì)量判斷的標(biāo)準(zhǔn)有哪些?

从江县| 辛集市| 海口市| 敦煌市| 新乡市| 中江县| 柳州市| 涞源县| SHOW| 莎车县| 澄迈县| 鄄城县| 淮南市| 鹤山市| 泗洪县| 峨眉山市| 栖霞市| 鄂托克前旗| 左云县| 新宁县| 公主岭市| 新竹市| 铜鼓县| 济南市| 石泉县| 阳城县| 邓州市| 广州市| 西林县| 和平县| 建瓯市| 遂昌县| 长葛市| 南昌县| 南城县| 伊春市| 河西区| 民乐县| 达孜县| 建始县| 太原市|